Part 1 - Re-roof Metal over Metal
This simple procedure of going over an old or leaky metal roof allows an occupant the ability to continue their daily business uninterrupted while we add 3” to 6” of blanket insulation between your old roof and a new MR-24 standing seam roof system from Butler Mfg. The MR-24 standing seam metal roof has been field documented to last up to and beyond 40 years, and is the most specified standing seam roof in the world. The MR-24 roof panel is a green product comprised of up to 40% recycled content, and is itself 100% recyclable.
It is possible to reroof a pre-engineered or conventional roof using one of the following three methods: